The Customer: OEZ PPT Lipetsk АО (JSC) (Industrial Special Economic Zone Lipetsk)
Works to be performed: Development of project and work documentation.
Design of the modular integrated transformer substation:
— substation capacity: 2×40 MVA;
— two power transformers 110/10 kV;
Design of power supply networks with the 10 kV cable line of length about 7 km. — Development of Engineering survey plan;
— Engineering survey and site investigation works;
— Development of project documentation including graphical materials and descriptive matters at stages: “Project Documentation” and “Work Documentation” developed according to the current legislation of the Russian Federation and the construction rules and regulations;
— taking part in the approval of engineering survey and project documentation.
— мощность Подстанции 2×40 МВА;
— два силовых трансформатора 110/10 кВ;
Запроектировать сети электроснабжения ориентировочной протяжённостью кабельных линий КЛ-10 кВ 7 км. — разработка Программы инженерных изысканий;
— выполнение инженерных изысканий;
— разработка проектной документации, состоящей из графических и текстовых материалов на стадиях «Проектная документация» и «Рабочая документация», подготовленных в соответствии с действующим законодательством Российской Федерации, строительными нормами и правилами;
— участие в согласовании инженерных изысканий и проектной документации.
Execution period: 17 November, 2020.