Design and survey works partially completed (project documentation, work documentation) on the project: Construction of Substation 220 kV Sukhoy Log of transformer capacity 126 MVA, construction of one-circuit OHTL 220 kV Peledui — Sukhoy Log, appr. length = 248 km, construction of 2 one-circuit OHTL’s 220 kV Sukhoy Log — Mamakan, appr. length = 169.9 km each

The Customer:

FGS UES PAO (JSC) – Main Power Networks of Siberia (MES Sibiri)

Виды работ:

Design and survey works (project documentation, work documentation)

Сроки реализации:

May, 2019 — April, 2020